AVENTURAS

View Original

More Condo Work — Master Bedroom / Bathroom

Additional walls are being erected, and the original cubed-glass wall is no longer part of the plan. After the walls are raised, they will be coated with cement, and the shower wall tiling will be removed while the toilet will be taken out. With the completion of the walls, the installation of floor tiling can begin.